Skip to content

Solution

Controlled-site logistics

Movement across private campuses, yards, and closed sites where the operating environment is controlled and the regulatory path is clear.

Who this is for

Facility, campus, and yard operators moving goods between buildings on private property rather than public roads.

Robot types involved

  • Sidewalk and yard courier robots on private property
  • Outdoor quadrupeds for perimeter and asset checks
  • Low-speed utility platforms operating inside a controlled boundary

What the control plane does here

  • Define the operating boundary and the rules for leaving it
  • Schedule recurring runs and one-off transfers from a single queue
  • Log every intervention, incident, and boundary exception
  • Produce the evidence pack a safety, insurance, or compliance review asks for

HumanForm Control Plane v0 is in development. Where a capability above is not yet shipped, we run it with our engineers alongside the customer's team during the deployment.

Deployment timeline

  1. Weeks 1-2

    Site survey

    Boundary definition, surface and weather review, connectivity.

  2. Weeks 3-4

    Integration plan

    Operating rules, risk register, acceptance criteria.

  3. Weeks 5-8

    Commissioning

    Route build, supervised operation, operator handover.

  4. Ongoing

    Governed operation

    Scheduled runs, exception handling, evidence export.

Timelines are planning ranges from our deployment templates. They are not a commitment until a site survey has been completed.

Proof state

Design-partner program open

No public case study is available yet

No public case study is available yet. Public-road operation is out of scope for initial deployments; we work inside controlled boundaries where the regulatory path is clear.

How we will publish results

Start with a site assessment

Tell us about the site, the task, and the constraint you are up against. We come back with a deployability read, not a pitch.

Assess my site