Control plane module
Deploy
Site survey, integration plan, risk register, acceptance criteria, operator training.
What it does
- Captures the site as a structured survey rather than a slide deck
- Turns the survey into an integration plan with named owners and dates
- Holds a risk register that has to be closed before go-live
- Records acceptance criteria that decide whether the deployment passed
- Tracks operator training and sign-off per person
How it works
- A deployment template captures the fixed parts of a site: routes, hazards, connectivity, escalation contacts.
- Each robot model carries its own integration checklist derived from the supported-systems entry.
- Acceptance criteria are written before commissioning and evaluated against logged runs, not impressions.
What it does not do
- Deployment templates exist for inspection, material movement, and controlled-site logistics only.
- Automated connector provisioning is in development; connectors are configured with our engineers today.
Design-partner program open — deployment templates are exercised with design partners before publication.
In development